案例展示

案例展示

current position: Home > Case > Electrical engineering
Chaoyang Bao Neng City

Chaoyang Bao Neng City

  • Category:Electrical engineering
  • Browse number:times
  • Release time:2025-01-15 18:43:10
  • Detailed Description

Project Introduction

Chaoyang Baoneng City covers an area of 71,702 square meters, with a total construction area of about 460,000 square meters, integrating residential, commercial, office building, hotel and kindergarten, and will be built into a metropolis of nearly 460,000 square meters for the Chaozhou people. The project is developed in three phases, consisting of 11 high-rise residential buildings, 1 office building and hotel, a large leisure shopping center, and 1 kindergarten.


image.png

Project Area: Chaoyang, Guangdong


Provide services

Transformer 9 sets

High and low voltage cabinets 126 sets

Installed capacity 8450KVA

Signing time 2018/12/27

Power on time 2020/8/17



Previous:None
  • menu
©2024 Shenzhen Sanjiang Electric Co., Ltd. 粤ICP备12064432号 disclaimer | Contact Us Legal Notice Privacy Policy