案例展示

案例展示

current position: Home > Case > Electrical engineering
Xinjiang Baoneng City

Xinjiang Baoneng City

  • Category:Electrical engineering
  • Browse number:times
  • Release time:2025-01-15 18:38:42
  • Detailed Description

Project Introduction

Xinjiang Baoneng City is located in the core of the high-speed railway area, with a total construction area of 2 million square meters. With a 278-meter-high Grade A office building as the core, Xinjiang Baoneng City forms a landmark cluster with five super high-rise buildings, and establishes the “No.1 High” city image card in the core area of Urumqi High-speed Railway. Xinjiang Baoneng City gathers many Fortune 500 enterprises at home and abroad, and will become an international business park with high standard, high starting point and high platform, providing supporting facilities for the construction of the national “One Belt, One Road” program.


image.png

Project Area: Urumqi, Xinjiang


Provide services

Transformer 18 sets

High and low voltage cabinets 196 sets

Installed capacity 20750KVA

Signing time 2018/3/29

Power on time 2021/11/10


  • menu
©2024 Shenzhen Sanjiang Electric Co., Ltd. 粤ICP备12064432号 disclaimer | Contact Us Legal Notice Privacy Policy